Skip to content
Qualification evidence

Evidence for programmes that cannot take a claim on trust.

Space, defence and government programmes ask a different question from a commercial evaluation: not only whether a part works, but what has been shown about it, under which conditions, and who holds the record.

The evidence

What a programme can ask for.

Test and design evidence held by Quside and released under the terms your programme requires. Send us the mission profile and an engineer will say which of it carries.

Space qualification, Ruby™ N1

Qualification evidence supports operation of the Ruby™ N1 photonic entropy engine in GEO conditions. It covers the entropy engine, and it is programme evidence held by Quside rather than a public certificate.

Next step

Confirm the current status with the programme team before you cite it in a bid.

Environmental and lifecycle evidence

Environmental and lifetime evidence for the entropy engine sits behind the space qualification work. Quside designs the photonic and electronic chips, outsources fabrication, and runs production and final test in-house, so the test and screening record stays with the company.

Next step

Ask for the environmental limits held for your product and revision.

US and European supply chain

Ruby™ N1 is a monolithic photonic chip, and photonic foundry supply runs through both US and European foundries. Quside is fabless: it designs the chips, outsources fabrication and ships fully tested cards.

Next step

Ask how the supply chain is documented for your programme office.

Reuse

Qualification work that keeps paying.

The expensive part of adopting a new entropy source is rarely the part itself. It is the qualification, the software integration and the evidence package. The portfolio is built so that work done once carries into the next form factor and the next programme.

01

One entropy engine

Garnet™ PCIe and Nellite™ FMC are built around the same Ruby™ N1 photonic engine; the compact Onyx™ line is built on Ruby™ S1. Evidence produced for the engine carries into every product that uses it.

02

One assurance model

The same runtime loop applies across the portfolio: physical process, measurement, entropy estimate, health state, audit output. Understand it once and it holds for every product.

03

One software surface

Linux C and Python drivers for the PCIe products and VHDL IP cores for the FMC products mean integration work done during qualification is not thrown away at the next form factor.

By programme type

Where the evidence is usually asked for.

Space, defence and government programmes, and what already exists for each.

Space

Qualification evidence supports operation of Ruby™ N1 in GEO conditions, and the Nellite™ Plus A41 FMC form factor is the one most often used where an FPGA payload needs a local entropy source.

Discuss a mission requirement →

Defence

Trust boundaries in defence systems frequently cannot depend on a network, which is the whole argument for a local source. First Onyx™ units have shipped to defence customers.

Discuss an embedded integration →

Government

Quside PCIe One and FMC One are qualified at ENS Alta, the highest category of the Spanish national security framework, and the same two products carry NIST SP 800-90B entropy certificate E178.

Request the certificate references →
Ask an engineer

What we send under a programme agreement.

Each is controlled per product, per revision or per programme, so we send the version that matches your build.

Qualification package index

The index of environmental, lifetime and screening evidence held for a given product revision, issued under a programme agreement. Name the product and revision.

Request the index →

Reference calls under NDA

Where a programme has agreed to act as a reference, we arrange the call under NDA so you can ask them what the integration actually took.

Arrange a reference call →

Operating and survival conditions

The validated figures are stated per product and per revision. Tell us the product in your design and we will send the set that matches it.

Request the figures →

Bring us the qualification requirement.

Environment, lifetime, form factor and the evidence your programme office expects are usually enough for us to say what already exists, what is reusable, and what would have to be produced.